Corporate News

Steel Cutting ceremony for 2 +2 65m anchor handling tug / oil recovery / supply vessel

Date:2014-02-25 Look:[ ]

 

2 +2 65 m anchor handling tug / oil recovery / supply vessel, ship-owner from Singapore, steel cutting ceremony at Wuhu Xinlian Shipbuilding Co., Led , scheduled as followed:

W1311---February 25, 2014

W1312/W1313---March 12, 2014  

W1314---May 9, 2014

Classification under BV, unrestricted area design , length 65M,  Breadth 16M , depth 7.2M , design draft 5M , dual propellers (CPP), the host power 2 * 3000PS, speed reached 13 knots, 2 bow with 10 tons of bow thruster, stern with a stern thruster units 8 tons, Dynamic Positioning System of DP2, bollard pull of 80 tons, as most popular offshore support vessel global market, AHTS tug supply vessels and anchor control functions together, play an essential role in the industry .

Our Marketing Manager Mr. Henry Luo attended the ceremony on behalf of the company, executive vice president Lu attended the ceremony as the owner's representative. Mr.TANG from Singapore and his team , BV Surveyor Mr. Yu Hongwei , Mr. Jian , deputy chief Zhou Xin Xing, Mr. Chen Anming of Xinlian Shipyards, the Steel cutting ceremony , initiated by the owner's representative Mr.TANG ignition switch

The ship officially started, It's the solid step progressed to the offshore market.